ToolAssay

Industrial ground-up development underwriting — construction to hold to exit

Industrial ground-up development underwriting — construction to hold to exit. S-curve hard cost draws, blended LTC construction loan, capitalized interest, per-tenant NNN lease stabilization, perm loan sizing, TI/LC reserves on rollover. Returns yield on cost, spread to cap, profit on cost, IRR and MOIC.

Answeringour last check, 2026-10-04
1 of 1checks answered this week
874 msmedian answer time
$2.00listed price per call
$2.00price it asked us

Paid test badge: not yet. The checks above are free: we call the tool without paying and read the payment request it sends back. The Verified badge needs paid calls whose answers match the promised output, and nobody can buy a badge.

Endpoint

POST https://financial-analyst.ai/industrial-dev/underwrite

CategoryEverything else
Provider hostfinancial-analyst.ai
Networkseip155:8453
Payment schemesexact
Self-reported calls, 30 days0 from 0 payers (the provider's figure, not ours)

Our checks, last 30 days

DayResultHTTPAskedTime
2026-10-04 valid payment request 402$2.00 874 ms

Example input (from the provider)

{
  "body": {
    "cl_advance_rate": 0.65,
    "cl_rate": 0.085,
    "construction_months": 24,
    "developer_fee_pct": 0.02,
    "draw_schedule": "s_curve",
    "exit_cap_rate": 0.06,
    "hard_costs": 52500000,
    "hold_years": 5,
    "land_cost": 8000000,
    "opex_per_sf_yr": 3.5,
    "perm_ltv": 0.65,
    "perm_rate": 0.065,
    "soft_costs": 5250000,
    "stabilization_months": 12,
    "stabilized_cap_rate": 0.055,
    "start_date": "2026-01-01",
    "tenants": [
      {
        "escalator_pct": 0.025,
        "label": "Tenant A",
        "lease_start_month": 25,
        "rent_per_sf_yr": 7.5,
        "rentable_sf": 200000,
        "term_months": 120
      }
    ],
    "total_sf": 350000
  },
  "bodyType": "json",
  "method": "POST",
  "type": "http"
}

Promised output schema (from the provider)

{
  "type": "object"
}

This page as JSON