{"slug":"financial-analyst-ai-industrial-dev-underwrite-a84fcf","title":"Industrial ground-up development underwriting — construction to hold to exit","host":"financial-analyst.ai","method":"POST","resource":"https://financial-analyst.ai/industrial-dev/underwrite","category":"other","description":"Industrial ground-up development underwriting — construction to hold to exit. S-curve hard cost draws, blended LTC construction loan, capitalized interest, per-tenant NNN lease stabilization, perm loan sizing, TI/LC reserves on rollover. Returns yield on cost, spread to cap, profit on cost, IRR and ","price_listed":2.0,"price_asked":2.0,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":874,"reported_calls_30d":0,"reported_payers_30d":0,"networks":["eip155:8453"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"body":{"cl_advance_rate":0.65,"cl_rate":0.085,"construction_months":24,"developer_fee_pct":0.02,"draw_schedule":"s_curve","exit_cap_rate":0.06,"hard_costs":52500000,"hold_years":5,"land_cost":8000000,"opex_per_sf_yr":3.5,"perm_ltv":0.65,"perm_rate":0.065,"soft_costs":5250000,"stabilization_months":12,"stabilized_cap_rate":0.055,"start_date":"2026-01-01","tenants":[{"escalator_pct":0.025,"label":"Tenant A","lease_start_month":25,"rent_per_sf_yr":7.5,"rentable_sf":200000,"term_months":120}],"total_sf":350000},"bodyType":"json","method":"POST","type":"http"},"output_schema":{"type":"object"},"history":[{"day":"2026-10-04","reachable":true,"status":402,"valid_402":true,"asked_usdc":2.0,"price_match":true,"latency_ms":874,"error":null}],"description_full":"Industrial ground-up development underwriting — construction to hold to exit. S-curve hard cost draws, blended LTC construction loan, capitalized interest, per-tenant NNN lease stabilization, perm loan sizing, TI/LC reserves on rollover. Returns yield on cost, spread to cap, profit on cost, IRR and MOIC.","last_updated":"2026-10-04T15:01:45.629Z","schemes":["exact"]}