{"slug":"www-mahastrategies-com-api-v1-micro-assembly-critical-path-9f5435","title":"Compute earliest/latest starts and finishes and slack on a declared DAG of at mo","host":"www.mahastrategies.com","method":"POST","resource":"https://www.mahastrategies.com/api/v1/micro/assembly-critical-path","category":"other","description":"Compute earliest/latest starts and finishes and slack on a declared DAG of at most 48 tasks. Rejects cycles and unknown dependencies. Reports peak overlap of declared unit resource claims at the earliest schedule; does not optimize a resource-constrained schedule or verify physical resources.","price_listed":0.057,"price_asked":0.057,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":750,"reported_calls_30d":1,"reported_payers_30d":1,"networks":["eip155:8453"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"body":{"dataClass":"synthetic","resources":[{"capacity":1,"key":"bench"}],"tasks":[{"dependsOn":[],"durationTicks":2,"key":"prep","resources":["bench"]},{"dependsOn":["prep"],"durationTicks":3,"key":"assemble","resources":["bench"]}]},"bodyType":"json","method":"POST","type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"body":{"additionalProperties":false,"properties":{"dataClass":{"enum":["public","synthetic"],"type":"string"},"resources":{"maxItems":16,"minItems":0,"type":"array"},"tasks":{"maxItems":48,"minItems":1,"type":"array"}},"required":["dataClass","tasks","resources"],"type":"object"},"bodyType":{"enum":["json","form-data","text"],"type":"string"},"method":{"enum":["POST"],"type":"string"},"type":{"const":"http","type":"string"}},"required":["type","method","bodyType","body"],"type":"object"},"output":{"properties":{"example":{"additionalProperties":false,"properties":{"amountBaseUnits":{"enum":["57000"],"type":"string"},"boundaries":{"maxItems":128,"minItems":0,"type":"array"},"inputDigest":{"maxLength":71,"type":"string"},"offerId":{"enum":["assembly-critical-path"],"type":"string"},"receiptDigest":{"maxLength":71,"type":"string"},"result":{"type":"object"},"version":{"enum":["maha-microproducts/0.1"],"type":"string"}},"required":["version","offerId","amountBaseUnits","inputDigest","result","boundaries","receiptDigest"],"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-10-11","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.057,"price_match":true,"latency_ms":750,"error":null}],"description_full":"Compute earliest/latest starts and finishes and slack on a declared DAG of at most 48 tasks. Rejects cycles and unknown dependencies. Reports peak overlap of declared unit resource claims at the earliest schedule; does not optimize a resource-constrained schedule or verify physical resources.","last_updated":"2026-10-11T09:02:00.608Z","schemes":["exact"]}