{"slug":"saylorinnovations-com-api-manufacturing-takt-860951","title":"Manufacturing takt time and hourly capacity from available minutes and demand","host":"saylorinnovations.com","method":"GET","resource":"https://saylorinnovations.com/api/manufacturing/takt?","category":"other","description":"Manufacturing takt time and hourly capacity from available minutes and demand","price_listed":0.01,"price_asked":0.01,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":291,"reported_calls_30d":1,"reported_payers_30d":1,"networks":["eip155:8453","solana:5eykt4UsFv8P8NJdTREpY1vzqKqZKvdp"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"method":"GET","queryParams":{"available_minutes":"450","demand_units":"90"},"type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"method":{"enum":["GET","POST","PUT","PATCH","DELETE","HEAD"],"type":"string"},"queryParams":{"properties":{"available_minutes":{"description":"required positive available production minutes (query)","type":"string"},"demand_units":{"description":"required positive demand units (query)","type":"string"}},"required":["available_minutes","demand_units"],"type":"object"},"type":{"const":"http","type":"string"}},"required":["type","method"],"type":"object"},"output":{"properties":{"example":{"properties":{"available_minutes":{"description":"Available, in minutes","type":"number"},"demand_units":{"description":"Demand units","type":"number"},"formula":{"description":"Formula used for the calculation","type":"string"},"scope_note":{"description":"What this data covers and what it leaves out","type":"string"},"takt_time_minutes":{"description":"Takt time, in minutes","type":"number"},"units_per_hour":{"description":"Units per hour","type":"number"}},"required":["available_minutes","demand_units","takt_time_minutes","units_per_hour","scope_note"],"type":"object"},"type":{"const":"json","type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-10-18","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.01,"price_match":true,"latency_ms":291,"error":null}],"description_full":"Manufacturing takt time and hourly capacity from available minutes and demand","last_updated":"2026-10-17T12:15:37.815Z","schemes":["exact"]}