{"slug":"saylorinnovations-com-api-construction-concrete-e3e8d4","title":"Concrete volume estimate for a rectangular pour with waste allowance","host":"saylorinnovations.com","method":"GET","resource":"https://saylorinnovations.com/api/construction/concrete","category":"other","description":"Concrete volume estimate for a rectangular pour with waste allowance - cubic meters and liters","price_listed":0.01,"price_asked":0.01,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":323,"reported_calls_30d":2,"reported_payers_30d":2,"networks":["eip155:8453","solana:5eykt4UsFv8P8NJdTREpY1vzqKqZKvdp"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"method":"GET","queryParams":{"depth_m":"0.1","length_m":"5","waste_percent":"10","width_m":"3"},"type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"method":{"enum":["GET","POST","PUT","PATCH","DELETE","HEAD"],"type":"string"},"queryParams":{"properties":{"depth_m":{"description":"required positive depth meters (query)","type":"string"},"length_m":{"description":"required positive length meters (query)","type":"string"},"waste_percent":{"description":"required non-negative waste allowance percentage (query)","type":"string"},"width_m":{"description":"required positive width meters (query)","type":"string"}},"required":["length_m","width_m","depth_m","waste_percent"],"type":"object"},"type":{"const":"http","type":"string"}},"required":["type","method"],"type":"object"},"output":{"properties":{"example":{"properties":{"depth_m":{"description":"Depth, in metres","type":"number"},"estimated_volume_liters":{"description":"Estimated volume liters","type":"number"},"estimated_volume_m3":{"description":"Estimated volume m3","type":"number"},"formula":{"description":"Formula used for the calculation","type":"string"},"length_m":{"description":"Length, in metres","type":"number"},"scope_note":{"description":"What this data covers and what it leaves out","type":"string"},"waste_percent":{"description":"Waste allowance as a percentage","type":"number"},"width_m":{"description":"Width, in metres","type":"number"}},"required":["length_m","width_m","depth_m","waste_percent","estimated_volume_m3","scope_note"],"type":"object"},"type":{"const":"json","type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-10-18","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.01,"price_match":true,"latency_ms":323,"error":null}],"description_full":"Concrete volume estimate for a rectangular pour with waste allowance - cubic meters and liters","last_updated":"2026-10-16T12:49:33.36Z","schemes":["exact"]}