{"slug":"rechen-halowerk-com-v1-project-network-critical-participatio-e2b89e","title":"Critical path participation counts longest project paths and identifies activiti","host":"rechen.halowerk.com","method":"POST","resource":"https://rechen.halowerk.com/v1/project-network-critical-participation","category":"other","description":"Critical path participation counts longest project paths and identifies activities required by every longest path. Use it when an agent needs prioritizing shared dependencies when parallel critical branches exist.","price_listed":0.005,"price_asked":0.005,"state":"answering","state_label":"Answering","checks_7d":4,"answered_7d":4,"latency_ms_median":901,"reported_calls_30d":1,"reported_payers_30d":1,"networks":["eip155:8453"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"body":{"tasks":[{"after":[],"id":"verify","ticks":76},{"after":["verify"],"id":"publisher","ticks":1005},{"after":["verify"],"id":"http","ticks":69},{"after":["publisher","http"],"id":"accept","ticks":2}]},"bodyType":"json","method":"POST","type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"body":{"additionalProperties":false,"properties":{"tasks":{"items":{"additionalProperties":false,"properties":{"after":{"items":{"pattern":"^[a-zA-Z0-9_-]{1,32}$","type":"string"},"maxItems":48,"minItems":0,"type":"array"},"id":{"pattern":"^[a-zA-Z0-9_-]{1,32}$","type":"string"},"ticks":{"maximum":1000000,"minimum":1,"type":"integer"}},"required":["id","ticks","after"],"type":"object"},"maxItems":60,"minItems":1,"type":"array"}},"required":["tasks"],"type":"object"},"bodyType":{"enum":["json","form-data","text"],"type":"string"},"method":{"enum":["POST","PUT","PATCH"],"type":"string"},"type":{"const":"http","type":"string"}},"required":["type","method","bodyType","body"],"type":"object"},"output":{"properties":{"example":{"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-11-27","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.005,"price_match":true,"latency_ms":873,"error":null},{"day":"2026-11-26","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.005,"price_match":true,"latency_ms":907,"error":null},{"day":"2026-11-25","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.005,"price_match":true,"latency_ms":898,"error":null},{"day":"2026-11-24","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.005,"price_match":true,"latency_ms":904,"error":null}],"description_full":"Critical path participation counts longest project paths and identifies activities required by every longest path. Use it when an agent needs prioritizing shared dependencies when parallel critical branches exist.","last_updated":"2026-11-24T01:57:05.756Z","schemes":["exact"]}