{"slug":"macro-x3digitalcapital-com-ai-grid-strain-098aa2","title":"Live strain on the power grids behind the AI data center build-out","host":"macro.x3digitalcapital.com","method":"GET","resource":"https://macro.x3digitalcapital.com/ai/grid-strain","category":"other","description":"Live strain on the power grids behind the AI data center build-out. Returns real-time demand for Texas (ERCOT), California (CAISO) and New York (NYISO): ERCOT demand against available capacity with percent headroom, wind and solar output; CAISO and NYISO demand against the operator forecast, todays ","price_listed":0.01,"price_asked":0.01,"state":"answering","state_label":"Answering","checks_7d":4,"answered_7d":4,"latency_ms_median":419,"reported_calls_30d":1,"reported_payers_30d":1,"networks":["eip155:137","eip155:42161","eip155:5042","eip155:8453"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"method":"GET","queryParams":{},"type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"method":{"enum":["GET"],"type":"string"},"queryParams":{"properties":{},"type":"object"},"type":{"const":"http","type":"string"}},"required":["type","method"],"type":"object"},"output":{"properties":{"example":{"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-11-28","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.01,"price_match":true,"latency_ms":420,"error":null},{"day":"2026-11-27","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.01,"price_match":true,"latency_ms":419,"error":null},{"day":"2026-11-26","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.01,"price_match":true,"latency_ms":418,"error":null},{"day":"2026-11-25","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.01,"price_match":true,"latency_ms":421,"error":null}],"description_full":"Live strain on the power grids behind the AI data center build-out. Returns real-time demand for Texas (ERCOT), California (CAISO) and New York (NYISO): ERCOT demand against available capacity with percent headroom, wind and solar output; CAISO and NYISO demand against the operator forecast, todays peak so far, and CAISOs generation mix. Each grid gets a fixed-rule strain level of normal, elevated or high. PJM and MISO need a login for real-time data and are not included. Each response includes a plain-English summary built from the data by fixed rules (no AI). No parameters. Official grid operator public data (ERCOT, MISO, NYISO) read live, with as-of times; cached up to 5 minutes. Not financial advice.","last_updated":"2026-11-25T15:50:50.273Z","schemes":["exact"]}