{"slug":"api-vrsai-tech-v1-capabilities-decision-optimization-91dd4e","title":"Choose the lowest-cost or highest-value feasible allocation, assignment, selecti","host":"api.vrsai.tech","method":"POST","resource":"https://api.vrsai.tech/v1/capabilities/decision_optimization","category":"other","description":"Choose the lowest-cost or highest-value feasible allocation, assignment, selection, or resource mix from caller-supplied options, capacities, budgets, and eligibility rules, with independently verified feasibility evidence and solver optimality/gap information.","price_listed":0.03,"price_asked":0.03,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":536,"reported_calls_30d":3,"reported_payers_30d":2,"networks":["eip155:8453","solana:5eykt4UsFv8P8NJdTREpY1vzqKqZKvdp"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"body":{"demands":[{"id":"warehouse_1","requirement":"80","satisfaction":"exact"}],"lanes":[{"demand_id":"warehouse_1","source_id":"supplier_a","unit_cost":"2"},{"demand_id":"warehouse_1","source_id":"supplier_b","unit_cost":"5"}],"objective":"minimize_total_cost","problem_type":"allocation","sources":[{"capacity":"100","id":"supplier_a"},{"capacity":"100","id":"supplier_b"}]},"bodyType":"json","method":"POST","type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"body":{"type":"object"},"bodyType":{"enum":["json","form-data","text"],"type":"string"},"method":{"enum":["POST"],"type":"string"},"type":{"const":"http","type":"string"}},"required":["type","method","bodyType","body"],"type":"object"},"output":{"properties":{"example":{"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-09-24","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.03,"price_match":true,"latency_ms":536,"error":null}],"description_full":"Choose the lowest-cost or highest-value feasible allocation, assignment, selection, or resource mix from caller-supplied options, capacities, budgets, and eligibility rules, with independently verified feasibility evidence and solver optimality/gap information.","last_updated":"2026-09-03T18:51:07.629Z","schemes":["exact"]}