{"slug":"api-vextorium-com-demanda-electrica-espana-pago-38db46","title":"Daily electricity demand in Spain (MWh) for the last N days with average, peak a","host":"api.vextorium.com","method":"POST","resource":"https://api.vextorium.com/demanda-electrica-espana-pago","category":"other","description":"Daily electricity demand in Spain (MWh) for the last N days with average, peak and low days and change versus the previous half of the period. Red Electrica de Espana data.","price_listed":0.003,"price_asked":0.003,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":332,"reported_calls_30d":0,"reported_payers_30d":0,"networks":["eip155:8453","solana:5eykt4UsFv8P8NJdTREpY1vzqKqZKvdp"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"body":{"dias":14},"bodyType":"json","method":"POST","type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"body":{"properties":{"dias":{"description":"Days (2-365, default 30)","type":"integer"}},"required":[]},"bodyType":{"enum":["json","form-data","text"],"type":"string"},"method":{"enum":["POST"],"type":"string"},"type":{"const":"http","type":"string"}},"required":["type","method","bodyType","body"],"type":"object"},"output":{"properties":{"example":{"properties":{"cambio_segunda_mitad_pct":{"type":["number","null"]},"desde":{"type":["string","null"]},"fuente":{"type":["string","null"]},"hasta":{"type":["string","null"]},"maximo":{"properties":{"dia":{"type":["string","null"]},"mwh":{"type":["number","null"]}},"type":["object","null"]},"media_mwh":{"type":["number","null"]},"minimo":{"properties":{"dia":{"type":["string","null"]},"mwh":{"type":["number","null"]}},"type":["object","null"]},"serie":{"items":{"properties":{"dia":{"type":["null","string"]},"mwh":{"type":["null","number"]}},"type":["null","object"]},"type":["array","null"]}},"type":["object","null"]},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-10-02","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.003,"price_match":true,"latency_ms":332,"error":null}],"description_full":"Daily electricity demand in Spain (MWh) for the last N days with average, peak and low days and change versus the previous half of the period. Red Electrica de Espana data.","last_updated":"2026-10-02T15:55:55.562Z","schemes":["exact"]}