{"slug":"api-tradeenergy-api-workers-dev-api-energy-nrel-atb-cost-ben-60a209","title":"NREL Annual Technology Baseline (ATB) electricity cost projections from the offi","host":"api.tradeenergy-api.workers.dev","method":"GET","resource":"https://api.tradeenergy-api.workers.dev/api/energy/nrel-atb-cost-benchmarks","category":"other","description":"NREL Annual Technology Baseline (ATB) electricity cost projections from the official open-data release on the OEDI data lake (latest release found automatically): LCOE ($/MWh), CAPEX, overnight capital cost, fixed/variable O&M, capacity factor and more, per technology and resource class, yearly to 2","price_listed":0.002,"price_asked":0.002,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":20,"reported_calls_30d":2,"reported_payers_30d":2,"networks":["eip155:10","eip155:137","eip155:143","eip155:42161","eip155:42220","eip155:480","eip155:5042","eip155:8453","solana:5eykt4UsFv8P8NJdTREpY1vzqKqZKvdp","stellar:pubnet","xrpl:0"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"method":"GET","queryParams":{"metric":"LCOE","scenario":"Moderate","technology":"UtilityPV","year":"2030"},"type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"method":{"enum":["GET"],"type":"string"},"queryParams":{"properties":{"allClasses":{"description":"true to return every resource class, default only NREL's representative (default) class","type":"string"},"case":{"description":"Financial case as published (ATB 2025: Exp or R&D; older: Market or R&D). Default: Exp, else Market","type":"string"},"crpYears":{"description":"Cost recovery period in years, 20 or 30 (default 30)","type":"string"},"metric":{"description":"One of LCOE, CAPEX, OCC, Fixed O&M, Variable O&M, CF, Fuel, Heat Rate, FCR, WACC Real (default LCOE)","type":"string"},"scenario":{"description":"Moderate (default), Advanced or Conservative","type":"string"},"taxCredits":{"description":"true to use the tax-credit case (ITC/PTC), default false","type":"string"},"technology":{"description":"ATB technology, e.g. UtilityPV, LandbasedWind, OffShoreWind, NaturalGas_FE, Nuclear, Geothermal, Utility-Scale Battery Storage, CommPV, ResPV, Hydropower, CSP, Biopower, Coal_FE","type":"string"},"year":{"description":"Single projection year (e.g. 2030). Omit for the full yearly series","type":"string"}},"required":["technology"],"type":"object"},"type":{"const":"http","type":"string"}},"required":["type","method"],"type":"object"},"output":{"properties":{"example":{"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-10-24","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.002,"price_match":true,"latency_ms":20,"error":null}],"description_full":"NREL Annual Technology Baseline (ATB) electricity cost projections from the official open-data release on the OEDI data lake (latest release found automatically): LCOE ($/MWh), CAPEX, overnight capital cost, fixed/variable O&M, capacity factor and more, per technology and resource class, yearly to 2050-2060, for a scenario, financial case, tax-credit setting and cost-recovery period. US-focused, real-dollar values as published by NREL.","last_updated":"2026-10-23T22:26:03.934Z","schemes":["exact"]}