{"slug":"api-ozdreamtools-de-api-deadlines-065130","title":"Calculates when a legal deadline ends in Germany (Fristende, due date) under §§ ","host":"api.ozdreamtools.de","method":"POST","resource":"https://api.ozdreamtools.de/api/deadlines","category":"code","description":"Calculates when a legal deadline ends in Germany (Fristende, due date) under §§ 187-193 BGB, the German Civil Code: event vs commencement start (§ 187), end by days/weeks/months/years including a missing day of month (§ 188), and postponement to the next working day when it falls on a Sunday, Saturd","price_listed":0.05,"price_asked":0.05,"state":"answering","state_label":"Answering","checks_7d":1,"answered_7d":1,"latency_ms_median":30,"reported_calls_30d":1,"reported_payers_30d":1,"networks":["eip155:8453"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"body":{"length":2,"mode":"event","start":"2026-07-23","state":"HE","unit":"weeks"},"bodyType":"json","method":"POST","type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"body":{"properties":{"length":{"description":"Length of the period, positive integer","type":"integer"},"mode":{"description":"event = § 187 (1), the start day does not count; beginning = § 187 (2), it does","enum":["event","beginning"],"type":"string"},"start":{"description":"Start date YYYY-MM-DD (day of the event, or first day)","type":"string"},"state":{"description":"Optional. Federal state code for § 193 (BW BY BE BB HB HH HE MV NI NW RP SL SN ST TH SH)","type":"string"},"unit":{"description":"Unit of the period","enum":["days","weeks","months","years"],"type":"string"}},"required":["start","length","unit","mode"]},"bodyType":{"enum":["json","form-data","text"],"type":"string"},"method":{"enum":["POST"],"type":"string"},"type":{"const":"http","type":"string"}},"required":["type","method","bodyType","body"],"type":"object"},"output":{"properties":{"example":{"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-09-24","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":30,"error":null}],"description_full":"Calculates when a legal deadline ends in Germany (Fristende, due date) under §§ 187-193 BGB, the German Civil Code: event vs commencement start (§ 187), end by days/weeks/months/years including a missing day of month (§ 188), and postponement to the next working day when it falls on a Sunday, Saturday or public holiday (§ 193). With a federal state the statewide holidays are honoured, without one only Sunday/Saturday; that limit is stated. Returns an end date, not a count of working days.","last_updated":"2026-09-16T15:39:04.472Z","schemes":["exact"]}