{"slug":"api-brazilayer-com-v1-cadeias-energia-br-828112","title":"Causal chain for Brazilian power risk","host":"api.brazilayer.com","method":"GET","resource":"https://api.brazilayer.com/v1/cadeias/energia_br","category":"other","description":"Causal chain for Brazilian power risk: forecast rainfall over the Southeast/South (leads reservoir levels by ~2-4 weeks) → stored hydro energy per subsystem and its 7-day slope, from the grid operator → likelihood of thermal dispatch and cost pressure. Brazil runs on hydro: this is the upstream of i","price_listed":0.05,"price_asked":0.05,"state":"answering","state_label":"Answering","checks_7d":7,"answered_7d":7,"latency_ms_median":837,"reported_calls_30d":1,"reported_payers_30d":1,"networks":["eip155:8453"],"badge":"unverified","paid_checks_7d":0,"paid_ok_7d":0,"example_input":{"method":"GET","queryParams":{},"type":"http"},"output_schema":{"$schema":"https://json-schema.org/draft/2020-12/schema","properties":{"input":{"additionalProperties":false,"properties":{"method":{"enum":["GET"],"type":"string"},"queryParams":{"properties":{},"type":"object"},"type":{"const":"http","type":"string"}},"required":["type","method"],"type":"object"},"output":{"properties":{"example":{"type":"object"},"type":{"type":"string"}},"required":["type"],"type":"object"}},"required":["input"],"type":"object"},"history":[{"day":"2026-11-27","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":834,"error":null},{"day":"2026-11-26","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":817,"error":null},{"day":"2026-11-25","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":856,"error":null},{"day":"2026-11-24","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":861,"error":null},{"day":"2026-11-23","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":837,"error":null},{"day":"2026-11-22","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":838,"error":null},{"day":"2026-11-21","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":837,"error":null},{"day":"2026-11-20","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":835,"error":null},{"day":"2026-11-19","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":838,"error":null},{"day":"2026-11-18","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":858,"error":null},{"day":"2026-11-17","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":4729,"error":null},{"day":"2026-11-16","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":843,"error":null},{"day":"2026-11-15","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":870,"error":null},{"day":"2026-11-14","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":831,"error":null},{"day":"2026-11-13","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":835,"error":null},{"day":"2026-11-12","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":821,"error":null},{"day":"2026-11-11","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":878,"error":null},{"day":"2026-10-29","reachable":true,"status":402,"valid_402":true,"asked_usdc":0.05,"price_match":true,"latency_ms":940,"error":null}],"description_full":"Causal chain for Brazilian power risk: forecast rainfall over the Southeast/South (leads reservoir levels by ~2-4 weeks) → stored hydro energy per subsystem and its 7-day slope, from the grid operator → likelihood of thermal dispatch and cost pressure. Brazil runs on hydro: this is the upstream of industrial energy cost, and the rule and its limits travel in the response. Free sample, no payment: https://api.brazilayer.com/v1/cadeias/amostra","last_updated":"2026-11-11T11:30:44.993Z","schemes":["exact"]}